The New York Tunnel Extension of the Pennsylvania Railroad.
Paper No. 1150

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. Paper No. 1150

تقييمك:
0
No votes yet
المؤلف:
دار النشر: Project Gutenberg
الصفحة رقم: 6

Company, was also Secretary of the Board until his resignation on January 31st, 1907. Mr. William Couper was Acting-Secretary from April 15th, 1907, to April 30th, 1909.

S. Johannesson, Assoc. M. Am. Soc. C. E., was Engineer Assistant to the Chairman from December 1st, 1905, to April 30th, 1909.

Division of the Work.—For the purposes of actual construction, the line was divided into four parts: the Meadows Division, the North River Division, the Terminal Station, and the East River Division. A chief engineer appointed by the Management had charge of the construction of each Division. The chief engineers exercised full authority in the organization of the working forces, and in the general conduct and management of the work of construction on their respective Divisions, in accordance with the plans for such work approved by the Board of Engineers and the Management.

Architects were employed to design the Terminal Station building and superintend its erection; and structural engineers to design and erect steel structures and facilities, and carry on the work under the direction of a Chief Engineer of the Company.

Committees, consisting principally of officers of the Pennsylvania Railroad Company, co-operating with the regular engineering organization, were appointed to consider the operating features of the project, so that the experience of the Pennsylvania Railroad Company's organization might be utilized in the work.

Description of the Line.

The following summary description of the various divisions of the line is intended to give a comprehensive idea of the general features of the project. Full details will be given in succeeding papers. The line and its respective divisions are shown on Plate I.

Meadows Division.—Chief Engineer until March 1st, 1906, Mr. William H. Brown, Chief Engineer, Pennsylvania Railroad Company, when he retired from active service with the latter Company; since March 1st, 1906, Mr. Alexander C. Shand, Chief Engineer, Pennsylvania Railroad Company.

This Division consists of an "interchange yard" at Harrison, near Newark, N. J., adjoining the tracks of the present New York Division of the Pennsylvania Railroad, and a double-track railroad across the Hackensack Meadows to the west side of Bergen Hill, a distance of 6.04 miles. The construction is embankment and bridge work, including bridges across the Pennsylvania, Erie, and Lackawanna Railroads, and the Hackensack River.

North River Division.—Chief Engineer, Mr. Charles M. Jacobs.

This Division commences at the west side of Bergen Hill and passes through the hill in two single-track rock tunnels to a large permanent shaft at Weehawken, near the west shore of the North River, and thence eastward a distance of 224 ft. to the Weehawken shield-chamber. It then passes under the river through two cast-iron, concrete-lined, single-track tunnels, with outside diameters of 23 ft., to a point under 32d Street, near Eleventh Avenue, in New York City, and thence through two single-track tunnels of varying cross-section, partly constructed in cut-and-cover, to the east side of Tenth Avenue. It then passes into the Station Yard and terminates at the east building line of Ninth Avenue. The work included the Station Yard excavation and walls from Tenth Avenue to Ninth Avenue, and the retaining walls and temporary underpinning of Ninth Avenue. The aggregate length of the line in this Division is 2.76 miles.

New York Station and Approaches.—Mr. George Gibbs, Chief Engineer of Electric Traction and Station Construction.

The Station and its approaches extend from the east line of Tenth Avenue eastward to points in 32d Street and 33d Street, respectively, 292 ft. and 502 ft. east of the west line of Seventh Avenue. This Division included the construction of subways and bridges for the support of 31st and 33d Streets and Seventh, Eighth, and Ninth Avenues, the Station building between Seventh and Eighth Avenues, the foundations for the post office to be erected west of Eighth Avenue, the service power-house in 31st Street between Seventh and Eighth Avenues, the power-house in Long Island City, the traction system, tracks, signals, and miscellaneous facilities required in the physical construction of the entire terminal railroad ready for operation. Messrs. McKim, Mead, and White were the architects for the Station and Messrs. Westinghouse, Church, Kerr and Company executed the structural engineering work, both in the station and for the support of the streets, as well as the construction of the subways.

The station is of steel skeleton construction with masonry curtain walls, all supported by a system of columns extending to a rock foundation. This building covers two city blocks and one intersecting street, and has an area of about 8 acres. It is 774 ft. long, 433 ft. wide, with an average height above the street of 69 ft., and a maximum of 153 ft. The main waiting-room is 277 ft. long, 103 ft. wide and 150 ft. high. The Concourse is 340 ft. long and 210 ft. wide.

The level of the track system below the street surface varies from 39 to 58 ft., and is from 7 to 10 ft. below mean high water in the harbor, thereby necessitating the establishment of an elaborate system of drainage over the entire station yard area. Access to the street is gained by elevators and stairways.

To accelerate the loading and unloading of the trains, high platforms will be constructed in the station on a level with the floors of the cars, in order to avoid the use of car steps and increase the traffic capacity of the station.

There will be 21 standing-tracks at the station, and 11 passenger platforms, providing 21,500 ft. of platform adjacent to passenger trains. Within the station area, which from Tenth Avenue to the normal tunnel sections east of Seventh Avenue comprises 28 acres, there will be a total of about 16 miles of track.

The service plant for the installation of machinery for lighting, heating, and ventilating the station, and for operating the interlocking system, is located in an independent building south of the station.

The Power-House to supply the electrical energy for the operation of the tunnel line and the Long Island Railroad is situated on property in Queens Borough adjoining the present Long Island Railroad Station near the East River, and was constructed under the Chief Engineer of Electric Traction and Station Construction. As at present designed, the dimensions of the structure are 200 ft. by 262 ft., outside measurement. It can accommodate six generating units of 5,500 kw., the standard adopted for future work, and two of 2,500 kw. for lighting the tunnels. The ultimate capacity of this station when extended will be about 105,000 kw.

East River Division.—Chief Engineer, Mr. Alfred Noble.

This Division begins at the eastern limits of the New York Station at a point in 32d Street, 292 ft. east of the west line of Seventh Avenue, and at a point in 33d Street, 502 ft. east of the west line of