قراءة كتاب An Assessment of the Consequences and Preparations for a Catastrophic California Earthquake: Findings and Actions Taken
تنويه: تعرض هنا نبذة من اول ١٠ صفحات فقط من الكتاب الالكتروني، لقراءة الكتاب كاملا اضغط على الزر “اشتر الآن"
An Assessment of the Consequences and Preparations for a Catastrophic California Earthquake: Findings and Actions Taken
assignment letters. No specific plans have been prepared in this detail for other seismic risk areas, although it is expected that the Bay Area plan could be easily adapted to other areas. The Department of Defense and the Department of Transportation are developing detailed earthquake plans that would ensure a well-organized and adequate response to mission assignments for a major earthquake. The plans of other agencies need further development.
Very significant capabilities to assist in emergency response exist within the California National Guard, California Highway Patrol, the Departments of Health Services and Transportation, and the U.S. Department of Defense. Capabilities exist for such lifesaving activities as aerial reconnaissance, search and rescue, emergency medical services, emergency construction and repair, communications, and emergency housing and food. Current estimates by both Federal and State officials, however, indicate that at least 6 to 8 hours would be required before personnel and equipment can be mobilized and begin initial deployment to the affected area. During the period before the arrival of significant outside assistance critical to the saving of lives (especially of those trapped in collapsed buildings), the public would be forced to rely largely upon its own resources for search and rescue, first aid, and general lifesaving actions. The current level of public preparation for this critical phase of response can be described as only minimal. Much of the current state of preparedness arises from past programs aimed at a wide spectrum of emergencies, particularly civil defense against nuclear attack. New or strengthened programs are needed to enhance public preparedness.
FEMA has recently entered into a cooperative effort with California State and local governments to prepare an integrated prototype preparedness plan to respond to a catastrophic earthquake in Southern California or to a prediction of such an event. The plan's completion, in late 1981, promises to improve substantially the state of readiness to respond to the prediction and the occurrence of an earthquake in that area and to provide a model which could be applied to other earthquake-prone regions of California and the rest of the country.
F. FINDINGS, ISSUES, AND ACTIONS
The ad hoc committee responsible for this review developed several significant findings related to the implications of major earthquakes in California and our capabilities to respond to them. It then identified major relevant issues raised by these findings and caused a number of actions to be taken. A brief discussion of the results of its review follows.
1. Leadership
Finding: Effective leadership at all governmental levels is the single most important factor needed to improve this Nation's preparedness for a catastrophic earthquake in California. The problem of emergency preparedness is severely complicated because responsibilities for preparation and response cut across normal lines of authority. Further complication arises from the large areal extent of the impacts expected from a major earthquake, affecting literally dozens of government entities. The emergency services coordinator at any level of government is effective only to the extent he or she is backed by the political leadership at that level. This is especially true when preparedness activities must be done, for the most part, within existing resources. City and county officials must increasingly accept their share of the responsibility for preparedness, but commitment by State or Federal leaders is also essential. The general tendency among elected officials and the public is to ignore the existing hazard problem. Experience, however, teaches that effective response mechanisms must be in place before the disaster; they cannot be developed in the time of crisis. Overcoming this apathy and developing the organizational arrangements among Federal, State, and local government and volunteer agencies—together with the private sector and the general public will require, above all, leadership.
Issue: The leadership role of the Federal Government in preparing for a catastrophic earthquake in California and how this leadership role is to be exerted require clarification.
Action: The President has communicated with the Governor of California to indicate the results of this review, to express concern about the need for cooperative leadership to prepare for the event, and to offer to increase the Federal effort with the State of California and local governments in the cooperative undertaking to prepare for a catastrophic earthquake. He stressed that the Federal role is to supplement the effort and resources of the State, and that commitment of significant Federal resources would be contingent upon the application of significant State resources. In his response to the President's communications, the Governor of California underscored the State's readiness to participate in this cooperative effort and announced his signing into law a measure that would provide substantial State resources (see annex 1). A summary of the new law (A.B. 2202) is contained in annex 3.
2. Management of Preparedness and Response Activities
Finding: Preparedness must be developed as a partnership between Federal, State, and local governments with improvements needed at all levels, as none have the resources or authorities to solve the problem alone.
Issue: Since the Nation faces a very probable earthquake in California sometime during the next 30 years, FEMA should provide the necessary leadership, management, and coordination required to strengthen planning and preparedness within the Federal Government, as delegated under the National Earthquake Hazards Reduction Program of 1977 and the Disaster Relief Act of 1974. In this effort, FEMA requires the support and assistance of numerous other Federal agencies.
Actions: FEMA is taking steps to:
- Strengthen significantly its management, research, application, and coordination functions, as delegated under the National Earthquake Hazards Reduction Program and Disaster Relief Act.
- Lead other agencies in the development of a comprehensive preparedness strategy detailing specific objectives and assignments, and periodically monitor accomplishments in meeting assigned responsibilities.
Departments and agencies with appropriate capabilities will provide needed support to FEMA in strengthening Federal preparedness and hazard mitigation programs.
Issue: A major deficiency that has been identified is the potential for delay following a catastrophic earthquake in processing a request for a Presidential declaration of a major disaster, and the subsequent initiation of full-scale Federal support for lifesaving actions. The first few hours are critical in saving the lives of people trapped in collapsed buildings; consequently, this is when Federal support is needed most. Decisions on post-event recovery aspects of Federal assistance can be deferred until lifesaving operations are underway and sufficient information about damage is in hand.
Action: FEMA will develop and negotiate, before the event, an agreement with the State of California which will enable the President to declare a major disaster and initiate full-scale Federal support for lifesaving and humanitarian action within minutes of a