You are here

قراءة كتاب Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The Cross-Town Tunnels. Paper No. 1158

تنويه: تعرض هنا نبذة من اول ١٠ صفحات فقط من الكتاب الالكتروني، لقراءة الكتاب كاملا اضغط على الزر “اشتر الآن"

‏اللغة: English
Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910
The New York Tunnel Extension of the Pennsylvania Railroad.
The Cross-Town Tunnels. Paper No. 1158

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The Cross-Town Tunnels. Paper No. 1158

تقييمك:
0
No votes yet
المؤلف:
دار النشر: Project Gutenberg
الصفحة رقم: 7

the shaft.

Full-sized twin tunnel A and B Intermediate shaft.
(East of shaft.) Apr. 4, 1906. Oct. 31, 1906. 210 783 3.7 Top center heading and bench. Muck loaded by
steam shovel. Working alternately in headings
east and west of the shaft. Full-sized twin tunnel A and B Intermediate shaft.
(East of shaft.) Nov. 1, 1906. Dec. 26, 1906. 56 311 5.5 Top full-width heading and bench. Muck loaded
by steam shovel working exclusively on this
heading. Exploration drift A and B Intermediate shaft.
(West of shaft.) Mar. 1, 1907. July 23, 1907. 145 947 6.5 Exploration drift about 9 ft. by 12 ft. Mucking
by hand. Fourteen timber bents were placed in
March, and seven in April, 1907. Twin tunnel. Enlargement
of exploration drift A and B West shaft.
(East of shaft.) Sept. 6, 1907. Dec. 4, 1907. 89 603 6.8 Drift excavated to full width and bench. Muck
loaded by steam shovel.

Thirty-Second Street.

Type of excavation. Tunnels. Worked from: Dates. Time
elapsed,
in
days.
Length of
tunnel
excavated,
in
linear feet.
Average
advance
per day,
in
linear feet.
Methods and conditions.
From To
Full-sized single tunnel C 1st Ave. shaft. Jan. 25, 1906. Apr. 30, 1906. 95 367 3.9 Top heading and bench. Muck loaded by hand.
Full-sized single tunnel D 1st Ave. shaft. Jan. 27, 1906. Apr. 30, 1906. 93 354 3.8    "         "        "       "           "        "      "     "
Full-sized twin tunnel C and D 1st Ave. shaft. May 22, 1906.
Aug. 11, 1906.
July 24, 1906.[E]
Nov. 29, 1906.
173 810 4.7 Double heading and bench. Muck loaded by steam
shovel. Stretches aggregating 200 ft. narrowed
to about 25 ft. and later enlarged are included.
Narrowed twin tunnel C Intermediate shaft. Mar. 19, 1906. May 28, 1906. 70 58 0.8 Excavation about 30 ft. wide. Top full-width heading
and bench. Muck loaded by hand. Steam shovel
not installed.
Full-sized twin tunnel C Intermediate shaft.
(East of shaft.)
May 29, 1906.
July 18, 1906.
Aug. 12, 1906.
Jan. 15, 1907.
Feb. 17, 1907.
July 3, 1906[E]
July 31, 1906.
Nov. 23, 1906.
Feb. 5, 1907.
Mar. 21, 1907.
208 1,206 5.8 Excavation about 30 to 35 ft. wide. Top full-width
heading and bench. Muck loaded by steam shovel.
Full-sized twin tunnel C and D Intermediate shaft.
(West of shaft.)
Dec. 1, 1905. May 10, 1906. 161 225 1.4 Double heading and bench. Part of the muck handled
by hand and part by steam shovel.
Exploration drift C and D Intermediate shaft.
(West of shaft.)
Feb. 1, 1907. Sept. 13, 1907. 225 1,033 4.6 Exploration drift about 10 ft. by 13 in. Muck loaded
by hand. 14 ft. timbered.
Twin tunnel. Enlargement
of exploration drift
C and D Eastward from
open cut.
Feb. 1, 1908.
Feb. 14, 1908. 14 65 4.6 At portal of twin tunnels. Drift excavated to full
width and bench. Muck loaded by hand. 12 ft.
timbered.
Twin tunnel. Enlargement
of exploration drift
C and D Eastward from
open cut.
Feb. 15, 1908.
Apr. 14, 1908. 59 524 8.9 Drift excavated to full width and bench. Muck loaded
by steam shovel. Full-width tunnel timbered for 26
ft. independently of the main excavation.