Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Bergen Hill Tunnels. Paper No. 1154
src="@public@vhost@g@gutenberg@html@files@21083@21083-h@images@fig1thumb.png" alt="Figure 1 thumbnail" tag="{http://www.w3.org/1999/xhtml}img"/>
Per Round | Per Cubic Yard | Per linear Foot of Tunnel | |||||||
Total Depth Drilled | No. of Cubic Yards | Pounds of Dynamite | Adv. | Linear Feet Drilled | Pounds of Dynamite | Cu. Yd. | Linear Feet Drilled | Pounds of Dynamite | |
Heading | 140-155 | 18-21.6 | 93-131 | 5-6 | 8-9 | 5-6 | 3.6 | 29.-32 | 18-22 |
Bench | 110-120 | 53-60 | 76-97 | 3½-4 | 2 | 1.4-1.6 | 15.4 | 30.-31 | 21.5-24.6 |
Total | 19 | 59.63 | 39.5-46.6 | ||||||
Per cubic yard, whole tunnel section | 3 to 33 | 2.1-2.5 |
Blasting Notes: | Number of Sticks | |
Heading: |
First Round: 6 sticks, 60% in each cut hole, cut generally blasted twice |
36 to 72 |
Second Round: 3 side holes each side, 5 sticks, 40% ea. |
30 | |
Third Round: Rest of side holes and dry holes, 5 sticks, 40% each |
40 | |
Stub holes, say | 5 to 15 | |
Total Sticks | 111 to 157 | |
Total Pounds | 93 to 131 | |
Sub‑bench: |
4 widening holes; 2 to 3 sticks, each, 40% |
10 to 12 |
6 down holes; 5 to 7 sticks, each, 40% |
30 to 42 | |
Bench: | 6 holes; 6 to 8 sticks each, 40% | 36 to 48 |
Taking up bottom, average, say | 15 | |
Total Sticks | 91 to 117 | |
Total Pounds | 76 to 97 |
Per Round | Per Cubic Yard | Per linear Foot of Tunnel | |||||||
Total Depth Drilled | No. of Cubic Yards | Pounds of Dynamite | Adv. | Linear Feet Drilled | Pounds of Dynamite | Cu. Yd. | Linear Feet Drilled | Pounds of Dynamite | |
Heading | 190-220 | 35-42 | 134-196 | 6½-8 | 5.4-6.0 | 3.9-5.0 | 5.3 | 28 to 32. | 20.7-26.5 |
Bench | 110-130 | 55 | 79-106 | 4 | 2.-2.4 | 1.4-2.0 | 13.7 | 27.-33. | 19.2-27.4 |
Total | 19 | 55.-65. | 39.9-53.9 | ||||||
Per cubic yard, whole tunnel section | 2.9-3.4 | 2.1-2.8 |
Blasting Notes: | Number of Sticks | |
Heading: |
First Round; 2 to 3 relieving holes sprung with 4 to 5 sticks each |
8 to 15 |
8 cut holes, 7 sticks each (sometimes shot twice) |
56 to 112 | |
First side round, 6 holes, 6 sticks each |
36 | |
Widening and dry holes, 10 to 12, 6 sticks each |
60 to 72 | |
Total Sticks | 160 to 235 | |
Total Pounds | 134 to 196 | |
Sub‑bench: |
8 holes, 4 to 6 sticks, each |
32 to 48 |
Bench: | 8 holes, 6 to 8 sticks, each | 46 to 64 |
Taking up bottom, average | 15 | |
Total Sticks | 95 to 127 | |
Total Pounds | 79 to 109 |