Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Bergen Hill Tunnels. Paper No. 1154
class="fighead">Fig. 3.
Per Round | Per Cubic Yard | Per linear Foot of Tunnel | |||||||
Total Depth Drilled | No. of Cubic Yards | Pounds of Dynamite | Adv. | Linear Feet Drilled | Pounds of Dynamite | Cu. Yd. | Linear Feet Drilled | Pounds of Dynamite | |
Heading | 190 to 220 | 35 to 42 | 134 to 196 | 6½ to 8 | 5.4 to 6.0 | 3.9 to 5.0 | 5.3 | 28 to 32 | 20.7 to 26.5 |
Bench | 145 ” 190 | 90 to 110 | 118 ” 167 | 6½ ” 8 | 1.6 ” 1.9 | 1.3 ” 1.8 | 13.7 | 22 ” 36 | 17.8 ” 24.7 |
Total | 19 | 50 ” 58 | 38.5 ” 51.2 | ||||||
Per cubic yard, whole tunnel section | 2.6 ” 3.1 | 2.0 ” 2.6 |
Blasting Notes: | Number of Sticks | |
Heading: |
First Round: 2 to 3 relieving holes sprung, with 4 to 5 sticks each |
8 to 15 |
8 cut holes, 7 sticks each (sometimes shot twice) |
56 to 112 | |
First side round, 6 holes, 6 sticks each |
36 | |
Widening and dry holes, 10 to 12 holes, 6 sticks each |
60 to 72 | |
Total Sticks | 160 to 235 | |
Total Pounds | 134 to 196 | |
Sub‑bench: |
4 widening holes, 4 to 5 sticks each, 2 rounds |
32 to 40 |
6 down holes, 5 to 7 sticks each, 2 rounds |
60 to 84 | |
Bench: |
4 down holes, 5 to 7 sticks each |
20 to 28 |
6 to 8 lift holes, 5 to 6 sticks each |
30 to 48 | |
Total Sticks | 142 to 200 | |
Total Pounds | 118 to 167 |
Per Round | Per Cubic Yard | Per linear Foot of Tunnel | |||||||
Total Depth Drilled | No. of Cubic Yards | Pounds of Dynamite | Adv. | Linear Feet Drilled | Pounds of Dynamite | Cu. Yd. | Linear Feet Drilled | Pounds of Dynamite | |
Heading | 310-320 | 63-71 | 215-257 | 8-9 | 4.5-5.1 | 3.4-5.7 | 7.9 | 35.6-45. | 26.9-45.0 |
Bench | 190-210 | 89-100 | 107-155 | 8-9 | 1.9-2.2 | 1.2-1.7 | 11.1 | 21.1-24. | 13.3-18.9 |
Total | 19 | 56.7-69. | 40.2-63.9 | ||||||
Per cubic yard, whole tunnel section | 3.-3.6 | 2.1-3.4 |
Blasting Notes: All holes of whole round are cleaned and loaded before blasting is started |
Number of Sticks | |
First Round: |
5-6 lift holes, 7 to 9 sticks each |
35 to 54 |
First row, sub-bench, 6 holes, 6 to 8 sticks each |
36 to 48 | |
Second Round: |
Second row, sub-bench and widening holes, 8 to 10 holes, 6 to 8 sticks each |
48 to 64 |
Stub holes | 10 to 20 | |
Bench: Total Sticks |
129 to 186 | |
Total Pounds | 107 to 155 | |
Third Round: |
8 cut holes, 7 sticks each, often requires 3 to 4 charges |
112 to 224 |
Fourth Round: |
8 holes, First side round, 5 to 7 sticks each |
40 to 56 |
Fifth Round: |
8 holes, Second side round, 5 to 7 sticks each |
40 to 56 |
2 dry holes 5 to 7 sticks each |
10 to 14 | |
Sixth Round: |
4 to 6 widening holes and dry holes, 6 sticks each |
36 to 48 |
Stub holes |
20 to 30 | |
Heading: Total Sticks |