You are here
قراءة كتاب The American Type of Isthmian Canal Speech by Hon. John Fairfield Dryden in the Senate of the United States, June 14, 1906
تنويه: تعرض هنا نبذة من اول ١٠ صفحات فقط من الكتاب الالكتروني، لقراءة الكتاب كاملا اضغط على الزر “اشتر الآن"
The American Type of Isthmian Canal Speech by Hon. John Fairfield Dryden in the Senate of the United States, June 14, 1906
considerable importance, for it is evident that there was a decided and early preference on the part of certain members of the Board for a sea-level canal, and that to this particular project more attention was given and a more determined attempt was made to secure data in its defense than to the corresponding project for a lock canal. That is to say, while the special committee for the consideration of a sea-level canal had been appointed on September 16th, the corresponding committee to consider the lock project was not appointed until October 3d, or seventeen days later, with the additional disadvantage of the Board being on the ocean, with no opportunity to send for persons and papers during the short period of time remaining to take into due consideration all the facts pertaining to a lock canal, for, as I have said before, the last business meeting was held on November 24th.
Mr. Foraker.—Mr. President——
The Vice President.—Does the Senator from New Jersey yield to the Senator from Ohio?
Mr. Dryden.—Certainly.
Mr. Foraker.—I would like to ask the Senator whether on the 16th of September, when this motion was made by Mr. Hunter, if I remember correctly, the Board of Engineers had completed their investigations and explorations on the Isthmus? I did not observe.
Mr. Dryden.—No.
Mr. Kittredge.—Mr. President——
The Vice President.—Does the Senator from New Jersey yield to the Senator from South Dakota?
Mr. Dryden.—I yield.
Mr. Kittredge.—If the Senator from New Jersey will permit me, I will be glad to answer the question of the Senator from Ohio. The Board of Consulting Engineers sailed from New York on the 28th of September for the Isthmus and returned about the middle or 20th of October.
Mr. Foraker.—Sailed from the Isthmus?
Mr. Kittredge.—Sailed from New York for the Isthmus.
Mr. Foraker.—Then the motion was made by Mr. Hunter before the Board of Engineers left the United States.
Mr. Kittredge.—Certainly; to appoint a committee of investigation.
Mr. Dryden.—I should like to say at this point that while I have gladly yielded to Senators, I think it is quite probable that before I get through I shall cover any questions that may be asked. I would prefer to complete my remarks, and then I shall be very glad to answer any questions that Senators may choose to ask.
Mr. Foraker.—I beg pardon.
Mr. Dryden.—I was glad to yield to the Senator.
Mr. Foraker.—The speech is a very interesting one.
Mr. Dryden.—There is nothing in the minutes of the Board which disclosed that either proposition received the necessary deliberate consideration of the extremely complex and important details entering into the two respective projects, but it is evident that, regarding the sea-level proposition at least, there was a decided bias practically from the outset, which matured in the majority report favoring that proposition. What was in the minds of the members, what was done outside of the Board meetings, by what means or methods conclusions were reached, has not been made a matter of record and is not, therefore, within the knowledge of Congress.
It is true that the respective reports of the two committees were brought before the Board as a whole on November 14th and that the subject was discussed at some length on November 18th, when each member of the Board expressed his views for or against one of the two projects. But there remained only ten days before the last business meeting of the Board was held, when the foreign members sailed for home. The final reports, as they are now before Congress, apparently never received the proper and extended consideration of the Board as a whole, and the minority report favoring a lock canal seems never to have been discussed upon its merits at all. When I recall the very different procedure of the technical commission appointed by the New Panama Canal Company, which extended its consideration of the subject from February 3, 1896, to September 8, 1898, during which time ninety-seven stated meetings and a large number of informal meetings were held, I say, it seems to me, from a practical business point of view, casting no reflection upon either the ability or the fairness of judgment of the members of the International Board, that the mere element of time should weigh decidedly in favor of the verdict of the technical commission of 1898, which was unanimous for a lock canal.
Of the technical commission of 1896–1898, Mr. Hunter, chief engineer of the Manchester Ship Canal, was a member, and he at that time, without a word of dissent, joined the other members in giving the unanimous and emphatic expression of the committee in favor of a lock canal.
Mr. Teller.—Mr. President——
The Vice President.—Does the Senator from New Jersey yield to the Senator from Colorado?
Mr. Dryden.—Certainly.
Mr. Teller.—Will the Senator kindly repeat the date of that?
Mr. Dryden.—Of the technical commission of 1896–1898, Mr. Hunter, the chief engineer of the Manchester Canal, was a member. The technical commission was of the new French company.
Mr. Teller.—You refer to the commission of the new French company?
Mr. Dryden.—Yes, sir; the commission of the new French company.
Why he should now change his views and convictions and why he should now be so emphatic and pronounced in favor of a sea-level project is not set forth in anything that has been printed or been communicated to the Senate Committee on Interoceanic Canals. This hurried action, this scanty consideration, as I have stated, is the foundation upon which the advocates of the sea-level plan rest their appeal for support. This is the report and the evidence upon which Congress is requested to pronounce in favor of a sea-level project and give its indorsement to a plan which will involve the country in at least $100,000,000 of additional expenditure and which will delay the opening of the canal for practical purposes of navigation possibly for ten years or more after the lock canal can be finished and opened for use.
The Isthmian Commission restates certain points in a clear and precise way, which leaves no escape from the conclusion that both as to time and cost the majority members of the Board materially underestimated important factors, and that they have every reason to believe that the total estimate of cost of a sea-level canal should be raised to $272,000,000, and that the estimate of time for construction should be increased to at least fifteen and a half years. But under certain readily conceivable conditions it is practically certain that the construction of a sea-level canal will consume not less than twenty years.
The Isthmian Commission reëxamined carefully the question of relative efficiency of the proposed sea-level canal compared with a lock canal, and they pronounce emphatically and unequivocally in favor of the lock project. They consider that the assumed danger from accidents to locks by passing vessels or otherwise is greatly exaggerated, and hold that while no doubt accidents may occur, and possibly will occur, such dangers can and will be sufficiently guarded against by an effective method of supervision and control. They hold that a lock canal properly constructed and managed is in no sense a menace to the safety of vessels, and that much practical experience and particularly the half-century of successful operation of the "Soo" Canal have demonstrated the contrary beyond dispute. They point out that the canal with locks at a level of eighty-five feet will be a waterway three times the size, in navigable area, of the projected sea-level canal, and, omitting the locks from consideration, will therefore afford three times the shipping facilities.
They show that in the sea-level canal there will be