You are here

قراءة كتاب The Railway Builders: A Chronicle of Overland Highways

تنويه: تعرض هنا نبذة من اول ١٠ صفحات فقط من الكتاب الالكتروني، لقراءة الكتاب كاملا اضغط على الزر “اشتر الآن"

‏اللغة: English
The Railway Builders: A Chronicle of Overland Highways

The Railway Builders: A Chronicle of Overland Highways

تقييمك:
0
No votes yet
دار النشر: Project Gutenberg
الصفحة رقم: 8

and officials, the Kitten would not budge an inch. Finally an engineer, borrowed from the Baltimore and Ohio Railroad, reported that all that was needed was 'more wood and water,' and given these the Kitten gambolled along at twenty miles an hour.

The Champlain and St Lawrence was at first operated only in the summer, when its services as a portage route were most needed. After a decade of moderately successful working, it was decided, significantly, to lengthen the rail and shorten the water section of the route. By 1852 the rails had been extended northward to St Lambert, opposite Montreal, and southward to Rouse's Point, on Lake Champlain. Twenty years later this pioneer road, after a period of leasing, was completely absorbed by the Grand Trunk Railway.


Pages